New plumbing in residential and commercial buildings, pipelines and distribution, water purifying systems should be sanitized to kill bacteria when first put online, or if repairs or service has been performed.

Shock chlorination is one of the most popular methods for sanitizing pipelines. Chlorine’s powerful germicidal action eliminates slime bacteria, molds and algae.

The threat of excessive microbial growth along the interior walls of drinking water distribution pipes is a major health concern of water distribution officials. Bio-fouling development of an organic bacterial community, also commonly known as biofilm is composed of microorganisms and their secretions. It is present in almost every water distribution system, and when uncontrolled may present a threat to public health.

Biofilms are layers of bacteria that attach to the interior walls of water distribution pipes and to one another most heavily around corroded surfaces on pipes. The bacterial community traps nutrients, microbes, and waterborne pathogens to eventually form an almost impenetrable material. Almost immediately after attaching itself to pipeline walls, the organism begins building upon itself, adding layer upon layer, forming a plaque-like coating.

The start of bio-film growth can begin when the pipeline or distribution system is new due to the presence of dirt, foreign material, piping construction materials and bacteria from workers and the environment introduced during the construction phase.

Additional contamination can occur if the piping is serviced or repaired.

It is extremely important that when a new pipeline or plumbing system is put in service or repaired, a thorough sanitizing and cleaning of the piping is done.

Chemical Feed Pumps Floor and Skid Models

Advantages of sanitizing with shock-chlorination include:

  • Inactivates disease bacteria
  • Cleans piping and equipment of dirt and debris
  • Helps to prevent against bio-film formation

Proper and effective shock-chlorination procedure requires:

1. A dosage of 50 to 200 ppm of free chlorine evenly distributed through out the piping and fixtures depending   on pipeline and water system construction material.

2. Very accurate analysis of chlorine residual to verify that the levels are present same at fixtures and hose bib or valves sections.

3. Contact time with the piping and water system equipment at least 12 hours

4. Re analysis of chlorine residual every 12 hours.

     If the chlorine residual is less than 10 ppm after 12 hours, repeat the entire procedure as above. If the beginning dose is 50 to 100 ppm and the remaining residual after 12 hours is less than 10 ppm, this indicates severe bio-fouling or large amounts of dirt or slime present.

High Pressure High Volume Chemical Injection Metering Station

Shock-chlorination using the “slug-in method”:

Generally, we don’t recommend this method, since it relies on introducing a slug or large amount of chlorine (usually powdered bleach or tablets) into one section of the pipeline and hoping that this concentrated dose will properly sanitize the downstream sections. This is unreliable, and does not introduce a consistent, evenly distributed chlorine residual of 50 to 200 ppm throughout the system. It allows diluted water with varying residual levels of chlorine to flush through the system. It also can create very high levels of corrosive chlorine (over 500 ppm) which can damage fixtures and corrode copper and stainless steel.

Shock Chlorination Procedure by High-Pressure Metering Pump Injection:

Professional water treatment specialists and distribution system operators typically use this method. The procedure involves leaving the water system or pipeline under pressure and using a high pressure, low-volume metering pump to inject a concentrated chlorine solution while the water is flowing at a given flow rate. After a chlorine residual of 50 to 100 ppm is detected at each faucet or fixture (using a high-range chlorine test kit) the chlorine solution is allowed to remain in the pipes for 12 to 24 hours.

How to use the high-pressure metering pump injection method:

    1. Shut off the main line. Identify or install new ½ inches one or two female pipe thread ports with back flow prevention in the beginning of the pipeline or water system be fore main valve to connect chlorination pump system.
    2. Hook up chlorination station which is usually equipped with three high pressure (120-150 psi) chemical   injection pumps 100-200 liter per day (25-50 gpd) per day output capacity. Select or adjust speed and volume of pump or solution strength. In this procedure, a concentrated chlorine residual will be injected while the pipes are under line pressure from the temporary pumping station or city-water system.
    3. Make sure to use a metering pump that can develop pressures higher than the line pressure you are injecting proper chlorine concertation as required.
    4. Open hot and cold faucets to determine flow rate from flow meter (liter or gallon per minute flow  metre)
    5. Use the formula and example below to adjust the metering pump:

      Example: Compute metering pump setting to achieve 100 ppm applied chlorine dosage in a water stream flowing at 5 gallons per minute, using full strength 5 ppm sodium hypochlorite. 5 gpm x 100 ppm x 1440 (minutes/day) = 13.7 gallons per day 52,500 (ppm of sodium hypochlorite) Output of pump is 25 gallons per day.

      The example above calls for 13.7 gallons a day output. 13.7 gallons per day = .57 or 57%

      Set metering pump speed to 57%.

    6. Run the water in to the building, to pumping station or water system downstream until the sodium hypochlorite solution has filled all the pipes and a strong odor of chlorine is coming from the fixtures or faucets, both hot and cold. For best results, test the water at each fixture to verify that there is at least a 50 to 100 ppm chlorine residual, using a DPD method test kit.
    7. Allow the water to sit for 12 hours. Retest for chlorine residual with a high range chlorine analysis kit. If the water contains less than 10 ppm of chlorine, repeat entire procedure. The slime, scale, and odor-producing bacteria will interact with the chlorine and reduce the amount of chlorine residual in the piping. If it uses up all the chlorine, or the chlorine residual is less than 10 ppm, then the procedure may need to be repeated.
    8. Flush the piping and fixtures well to flush out scale and colored from water from the piping. Unscrew aerators and fixtures to avoid these items becoming plugged with sediment that may have been loosened in the chlorination process.

Caution: If the shock-chlorination procedure is being done on an old pipeline, or one that has accumulated scale or buildup, the procedure can loosen up scale, iron deposits and other materials in the piping, which can clog fixtures, appliances and valves in the piping system, causing a lot of problems. Care should be taken when flushing the piping, and all aerators removed to prevent clogging. In some extreme cases of corroded piping, the piping could fail and start to leak after this procedure.

 

Pressure and Continue Feeding Control and Header Set

Sodium Hypochlorite 5-20%by weight